If you are using peel-and-stick tiles, simply remove the backing sheet or apply adhesive to one quadrant of your full-spread tiles and press it into place on the floor ensure to align it with both guidelines. Start the application from the center point of the room. Some carpet squares have arrow stickers that indicate the recommended orientation adhering to these guidelines will help you to achieve the most pleasing result, but you can also think out of the box and get creative with the carpet tiles to create a unique result. Start the installation process of the carpet squares from the middle of the room and work toward the walls. This is a vital step if the carpet tiles have a pattern, as this enables you to plan out and adjust the layout properly so that you get a well-fitted result. Dry-Fit the Carpet Squaresĭry fit the carpet squares first before installation to give you an idea of how the final result will look when the tiles are installed. You may need one or two coatings and allow the sealer to dry for at least an hour. The next line of action is to seal your subfloor this is particularly important if it is made from porous material such as concrete or wood, which are very susceptible to water.Įxposure of such subfloor to moisture can cause the growth of mold and mildew, which could cause warping and ultimate damage to your floor.Īpply a quality sealer suitable for your subfloor using a paint roller and a metal tray, or spray it onto the subfloor surface using a water bottle or aerosol can. You can add a few drops of soap but make sure to rinse the floor with plain water after mopping. Once the floor is completely clean, you can go in with a mop and clear, warm water. You will probably have a lot of small particles that can interfere with the installation process. This is especially important if you used a concrete patch, putty, or sanded your wooden subfloor. Thoroughly sweep or vacuum the entire area. This helps the carpet squares adhesive to bond better to the floor. Once the subfloor is prepped and even, thoroughly clean the entire floor to remove any dirt, debris, or small particles. You can use a concrete patch to even out your concrete subfloor and fill in any cracks, chips, or spalls that may be present on the floor.įor plywood subfloors, you can fill gaps and cracks with wood putty or floor leveler. You can also lightly sand the floor to remove splinters or any uneven areas present on the surface of your wooden subfloor. Even relatively minor dips or peaks can be felt underfoot the carpet squares and can pose a tripping hazard. Prepare the SubfloorĪfter removing the old flooring, you would need to prep the subfloor and ensure it is completely flat. If you decide to remove the existing flooring, note that it can be a fairly labor-intensive job, and the type of flooring determines the exact removal process, but for the most part, you will need a pry bar or floor scraper for separating the flooring pieces from the subfloor and adhesive. Also, if the existing floor has dimensional features such as grout lines or textures, you may be able to feel it through the carpet. It runs the risk of preventing the adhesive from bonding securely to the material. Keep in mind that installing carpet squares over an existing floor, such as ceramic tile, hardwood, or vinyl, may save time but has some downsides. However, if the existing floor is smooth and flat, you can install the carpet squares directly over the floor. This exposes the subfloor, which can then be properly prepared. When the area is cleared out, start removing any old flooring. Start by moving all furniture out of the area to free up the space and prevent obstruction during the installation process.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |